- Check in with local dispatch and review the first container assignment.
- Arrive at the designated port or rail gate with required identification and appointment information.
- Locate the assigned container, connect the chassis and verify twist locks and connections.
- Exit the terminal and deliver or return the equipment to the customer or storage yard.
- Receive the next assignment while still completing the current move when equipment becomes available.
- Complete two to four container turns on most active days, depending on gate times and equipment status.
- Return the tractor to the company terminal or an approved yard at the end of the shift.