- Day starts with pre-trip and load check at the terminal or a supplier yard.
- First delivery is planned early; remaining stops shift with customer readiness.
- Mondays often pair a supplier pickup with two or three jobsite drops under heavier traffic.
- Mid-week days mix larger single loads, reloads and multi-stop sequences.
- Fridays push to finish material before weekend project shutdowns.
- Securement is re-inspected after leaving the yard and after hard braking or weather changes.
- Shift ends with post-trip inspection and return of equipment to the San Antonio yard.