- Pre-trip at Fort Wayne-area yard and confirm first trailer assignment.
- Pull loaded supplier trailer toward plant or staging yard.
- Gate check-in, dock or drop assignment, seal and paperwork verification.
- Release and receive next movement from dedicated dispatch.
- Complete empty-rack or reload exchange before returning to yard.
- Post-trip inspection and end-of-shift check-in.