- Day begins with a full pre-trip of tractor, tanker, hoses, valves and safety gear.
- First assignment is issued in the early dispatch window; driver heads to the designated fill point.
- After discharge, dispatch issues the next customer based on proximity and available water sources.
- Most shifts complete 3–6 loads depending on distance, fill queues and site conditions.
- The majority of the day combines local driving with hose connections, positioning and controlled discharge.
- Equipment returns to the San Bernardino terminal or approved yard after the final delivery.
- Peak construction periods can add Saturday work or later finishes.