- Most shifts begin between 4:00 and 7:00 a.m. after the driver reviews the dispatch message.
- One or two primary movements fill the day, depending on distance and appointment windows.
- Live load or unload commonly takes 1–3 hours; drop-and-hook shortens dock time when trailers are ready.
- Approximate operating mix: 35 % drop-and-hook, 45 % live load, 20 % live unload.
- After delivery the driver may reload near the destination, wait for a confirmed appointment, or reposition.
- Thursday and Friday loads often position equipment for the next operating day.
- A 34-hour reset is arranged when remaining hours and the next freight require it.