- Arrive at assigned plant before sunrise for pre-trip and first dispatch.
- Confirm mix and ticket details, then load under the batch point.
- Transit short-haul while keeping drum in required agitation mode.
- Check in with site personnel, position safely and discharge concrete.
- Confirm POD, clean chute, return to plant for next assignment.
- Complete multiple cycles; large pours may keep several mixers in sequence.
- End shift with washout and post-trip before parking at plant or yard.