- Check in with oilfield dispatch and review the day’s active customer assignments.
- First load typically starts at a freshwater source, transfer point or production location.
- Travel to the well site or receiving facility, complete site inspection and connect the hose system.
- Monitor the transfer, watch for leaks, disconnect and finish required documentation.
- Receive the next assignment while still finishing the current transfer; multiple short hauls are common.
- Return to the San Antonio area after 2–4 field days to close the rotation.