- Shift usually begins between 4:00 and 8:00 AM with pre-trip and dispatch confirmation.
- First move is often a loaded trailer already staged or a short deadhead to a customer facility.
- Most days consist of two to four warehouse turns rather than multi-stop delivery routes.
- Gate check-in, appointment confirmation and dock assignment follow each facility’s rules.
- After release, the next trailer assignment is normally provided before the current move is finished.
- Dispatch monitors available hours and will not add late turns that exceed HOS limits.
- End of shift returns the equipment to the terminal for fueling, paperwork or drop.