- Report to the Cleveland terminal or assigned yard around 5:00–6:30 AM.
- Complete pre-trip and review the day's plant appointment sequence.
- Pick up a staged trailer containing palletized production material.
- Make the first supplier or plant delivery during the morning production window.
- Return empty racks or packaging when the account requires a backhaul.
- Take a second or third plant movement based on production demand.
- Finish with a Cleveland-area reload, trailer drop or empty return.
- Complete post-trip inspection and ELD paperwork before clocking out.