- First load is often assigned the previous afternoon; tractor inspection follows arrival at the terminal or staging yard.
- Check in at the plant security gate with appointment number, tractor number and trailer number.
- Wait in a staging area or loading lane while shipping confirms the assigned freight.
- Verify load placement and securement after plant forklift or crane operators finish loading.
- Review BOL or shipping documents, complete final inspection, then depart for the next manufacturing stop.
- Same-day reassignments happen when a supplier load is delayed or production priorities shift.
- Friday often ends with empty-equipment returns and trailer positioning for the following Monday.