- Report for early dispatch between 4:30–7:00 AM and complete pre-trip plus pneumatic system check.
- Gate check-in, scale and positioning under the loading system at the terminal or bulk facility.
- Live loading commonly takes 30–75 minutes; vessel activity and silo queues can extend the process.
- Drive to the customer, connect the discharge hose, verify the receiving silo and unload under controlled pressure.
- Two to four loads are possible on short Tampa-area turns; longer Orlando, Ocala or southbound runs may limit the day to one or two deliveries.
- Return to the terminal or approved parking after the final delivery for home rest.