- Pre-trip and first delivery review typically begin between 5:30 and 7:00 AM.
- Confirm preloaded trailer or complete live loading at the supplier (30–90 minutes common).
- Most days include two to four deliveries; a large commercial drop can fill the shift.
- Next pickup assignment usually arrives after the first delivery is complete.
- Mid-week days generally carry the highest contractor volume.
- Equipment returns to the terminal or designated parking at shift end.
- Saturday work appears mainly during heavier construction periods.