- Complete pre-trip inspection and confirm available HOS before first call.
- Receive assignment tied to a released container or chassis need.
- Process through the rail ramp gate and verify equipment.
- Deliver or stage the container at the customer or transload point.
- Pick up the next available move or empty return from dispatch.
- Return the tractor to the designated terminal or yard at the end of the cycle.