- First container assignment is usually received before arrival at the ramp.
- Pre-trip tractor and chassis, then enter the designated rail gate.
- Complete ingate, confirm numbers, and inspect equipment for damage.
- Deliver to customer yard or staging area; typical wait 30–90 minutes.
- Collect POD or electronic confirmation and receive the next move.
- Return empty or reposition per dispatch; finish with post-trip at the terminal.