- First assignment is usually visible before the shift; later moves are assigned same-day.
- Terminal check-in, container and chassis inspection, then ingate.
- Loaded pickup followed by regional highway movement.
- Customer gate check-in, drop or live placement, POD and dispatch update.
- Empty return or next container assignment, then rail outgate.
- Monday often begins with a Cincinnati or Louisville plan; midweek runs more predictably.
- Thursday and Friday may include extra repositioning ahead of rail volume.