- Receive initial assignment at Midland base or staging yard and complete pre-trip.
- Check in at transload or sand facility, verify product and load documentation.
- Move under load system, confirm valves and pressure systems before departure.
- Travel regional highways then enter remote lease for gate check-in and staging.
- Connect hoses, monitor controlled pneumatic unloading and secure equipment.
- Finish delivery paperwork and accept next assignment or reposition empty.
- Return toward Midland within the 5–7 day home-time cycle based on HOS.