- Pre-trip inspection and first supplier assignment issued at the Saint Paul yard.
- Check-in at the loading yard, verify staged material, and complete securement before departure.
- Travel to the jobsite, confirm access with the site contact, and wait for forklift or crane if required.
- Unload under site rules, obtain signed POD, and document any shortage or damage.
- Receive next assignment by dispatch system or phone once the current delivery is released.
- Return to the terminal for parking, post-trip inspection, and report of securement-gear needs.