- Check in at the staging yard, run pre-trip inspection and log into ELD.
- Receive first trailer assignment and verify number plus seal.
- Move the loaded 53’ unit to the designated hub or station.
- Drop, pick the next assignment and repeat the transfer cycle.
- Reposition empties or stage equipment when volume demands it.
- Complete the final move, park the tractor and close out status.
- Morning outbound waves and evening redistribution set the daily tempo.