- Next load usually appears on the ELD before the current delivery is finished.
- Pre-trip, verify preloaded trailer number and seal at the pickup yard or DC.
- Run the primary leg, then take available backhaul or short reposition.
- About 60–70 % of activity is drop-and-hook; live loads average 45–120 minutes.
- Plan the 10-hour break around the next appointment rather than waiting until hours run out.
- Return to the Little Rock terminal or approved overflow for the scheduled weekend home period.