- Report to terminal or designated customer yard according to the production schedule.
- First assignment is usually planned the prior evening and can change overnight.
- Complete 3–6 short movements: supplier pickup, plant delivery, empty return, next supplier.
- Check in at gates with identification, tractor and trailer numbers, and load references.
- Handle drop-and-hook or live exchanges (roughly 60–70 % preloaded or staged).
- Document waiting of 20–60 minutes or longer during shift changes or production interruptions.
- End the shift at the terminal or authorized customer yard; no routine overnight truck-stop parking.