- Complete pre-trip and review the assigned farm sequence before departure.
- Work 8–15 farm stops with hose connection, transfer and documentation.
- Head to the processing facility once the tanker reaches planned capacity.
- Unload, verify samples and complete antibiotic-residue testing at the plant.
- Finish sanitary washout, post-trip inspection and terminal parking.
- Weekend rotations remain part of the schedule because milk production never stops.