- First assignment issued before shift start via ELD/tablet or dispatcher.
- Complete pre-trip of tractor, trailer, hoses, valves and air systems.
- Gate check-in, load-order verification and positioning under the plant load point.
- Monitor loading, secure valves and caps, obtain BOL, final walk-around.
- Customer arrival, silo confirmation, hose connection and 45–90 minute unload.
- Documentation, possible reload or reposition, then additional delivery or terminal return.
- Approximate time split: 10–20% loading, 15–25% unloading, 45–60% driving.