- Shift begins with pre-trip inspection and the first pre-planned airport assignment.
- Travel to O’Hare cargo area for gate check-in, trailer positioning or live load.
- Deliver or exchange trailer at a nearby industrial facility.
- Receive next movement from dispatch based on real-time cargo readiness.
- Complete second or third airport-to-warehouse cycle during the evening.
- Close out paperwork, drop equipment and return to the terminal or approved yard.
- Most shifts include 3–5 major movements plus short repositioning runs.